The head and members of the working group attached to the Koshkopir district of the Khorezm region of the Cotton Council reviewed the readiness of the cotton processing facility under the enterprise “WBM Koshkopir cluster” LLC to receive seed cotton and cotton harvest of 2022. In this case, the readiness of XPP type cotton receiving-transmitting devices, TLX-18 and KLP-650 type belt conveyors, UVP-22, VTs-10 types of wet air blowers was checked and used without loading. The cotton sampling area, the weighing room, the laboratory and its equipment, the storage areas, the reserve water reservoirs for fire fighting, the underground water intakes, the fire engine, the fire hydrants and the water suction pumps were examined. At the same time, the state of readiness of the technological equipment of the enterprise for the initial processing of cotton was considered. Cotton ginning plant and preparation area are ready for receiving, ginning and processing of cotton and tractors and trailers for transporting cotton. Appropriate instructions and recommendations were given to eliminate the identified minor deficiencies.